Railzone Ede

Renovation of railstation and railstation area

Project discription

Railzone Ede

To serve the increasing number of passengers at the station, the municipality of Ede and NS-Stations commissioned Prorail to revamp the Ede-Wageningen section. Residents and passengers could experience a piece of specialist engineering during construction. They could see how the pedestrian tunnel, next to the station, was being prepared to be slid into its final location later.

Our input

In collaboration with Van Hattum and Blankevoort, our professionals safely and efficiently made the concrete work. During this project, they prepared the concrete elements of the new pedestrian subway on the side, after which the tunnel was slid into position. Every day, thousands of people now pass through this tunnel. During the work, operations were scheduled to be out of service. At such times, trains do not run and the voltage on the overhead wires is completely cut off. Working with such deadlines requires a lot of coordination, planning, toolboxes and safety instructions. And fortunately, we have that expertise in-house.
Project status
Realised
Number of Aelbers man-hours
35.000 hrs
Number of Aelbers professionals
10 professionals
Realisation
Civil concrete construction
Large-scale projects, or smaller local projects... The variety makes it fun!

Jannek

Experienced carpenter & Aelbers Coach

Project discription

Railzone Ede

To serve the increasing number of passengers at the station, the municipality of Ede and NS-Stations commissioned Prorail to revamp the Ede-Wageningen section. Residents and passengers could experience a piece of specialist engineering during construction. They could see how the pedestrian tunnel, next to the station, was being prepared to be slid into its final location later.

Our input

In collaboration with Van Hattum and Blankevoort, our professionals safely and efficiently made the concrete work. During this project, they prepared the concrete elements of the new pedestrian subway on the side, after which the tunnel was slid into position. Every day, thousands of people now pass through this tunnel. During the work, operations were scheduled to be out of service. At such times, trains do not run and the voltage on the overhead wires is completely cut off. Working with such deadlines requires a lot of coordination, planning, toolboxes and safety instructions. And fortunately, we have that expertise in-house.
Civiele betonbouw
Project status
Realised
Number of Aelbers man-hours
35.000 hrs
Number of Aelbers professionals
10 professionals
Realisation
Civil concrete construction
Large-scale projects, or smaller local projects... The variety makes it fun!

Jannek

Experienced carpenter & Aelbers Coach

Ook meewerken aan dit project?

Hoe kan jij bijdragen
aan dit project

Projects we and our skilled workers are proud of

Projects we and our skilled workers are proud of

PROJECT

Rottemerentunnel (A16)

In the past few years, a lot of hard work has gone into creating an 11-kilometre stretch, setting the bar high for sustainability. To improve the quality of life and accessibility of the Rotterdam region, Rijkswaterstaat has built a new motorway along the northern parts of Rotterdam.

PROJECT

Railway station Ede-Wageningen

To serve the increasing number of passengers at the station, the municipality of Ede and NS-Stations commissioned Prorail to revamp the Ede-Wageningen section.

PROJECT

Dike reinforcement Doetinchem

Dikes are incredibly important to the Netherlands. Without them, the Netherlands would look very different. That is why it is very important to maintain these dikes.

PROJECT

Expansion A1 
Apeldoorn-Twello

Commissioned by Rijkswaterstaat, we widened the A1 together with our construction partner Heijmans. The A1 is an important economic link road in the Netherlands providing a direct connection to the European hinterland.

PROJECT

IJboulevard Amsterdam

A promenade along the IJ in Amsterdam with a hidden bicycle park under water. Together with our construction partner Van Hattum en Blankevoort, we built a bicycle park for 4,000 bikes in the heart of our capital city.

PROJECT

Construction Ring Zuid

Tackling the Ring Zuid Groningen means a large-scale conversion of the southern ring road. After seven years of work, the road was officially opened for use on 1 September 2024.

Meer weten over 

onze projecten? 

We vertellen 

graag meer!

Voornaam Achternaam

Adviseur Werving & Selectie
06 1234 5678Send a whatsapp message

Meer weten over 

onze projecten? 

We vertellen 

graag meer!

Voornaam Achternaam

Adviseur Werving & Selectie
06 1234 5678Send a whatsapp message

Weten wanneer er een mooie
kans voor jou beschikbaar is?

Laat je gegevens achter en wij houden je automatisch op de hoogte...