Project description

Ring South Groningen

Tackling the Ring Zuid Groningen means a large-scale conversion of the southern ring road. After seven years of work, the road was officially opened for use on 1 September 2024. This project, of gigantic scale, involves several structural works. Several widenings and subways merge seamlessly into a sunken section. Currently we are working hard to redevelop the area around the ring road. We are building bike tunnels and laying out parks. The new Zuiderplantsoen is scheduled to open to the public during 2025.

Our input

Our skilled workers, consisting of concrete carpenters and foremen, undertook the realisation of 12 kilometres of concrete work together with Combinatie Herepoort.
Various engineering structures, such as tunnels, viaducts, fly-overs and sunken sections, have been constructed on different clusters. After completion of the concrete work, our skilled workers installed various façade elements, railings and lintels for an attractive appearance and optimal functionality. Our professionals are still working on the finishing at the moment.
Combination Herepoort consists of: Max Bögl Nederland BV, Züblin Nederland BV, Oosterhof Holman Infra BV (Grijpskerk), Koninklijke Sjouke Dijkstra BV (leek) and Roelofs Wegenbouw BV (Den Ham).
Project status
Work in progress
Realisation
Civil concrete construction
I like working with Aelbers, because the people I ask for special work are offered. The guidance in terms of toolboxes and checking for neat work clothing is top arranged.

Adriaan Tichelaar

Construction executor Combinatie Herepoort

Project description

Ring South Groningen

Tackling the Ring Zuid Groningen means a large-scale conversion of the southern ring road. After seven years of work, the road was officially opened for use on 1 September 2024. This project, of gigantic scale, involves several structural works. Several widenings and subways merge seamlessly into a sunken section. Currently we are working hard to redevelop the area around the ring road. We are building bike tunnels and laying out parks. The new Zuiderplantsoen is scheduled to open to the public during 2025.

Our input

Our skilled workers, consisting of concrete carpenters and foremen, undertook the realisation of 12 kilometres of concrete work together with Combinatie Herepoort.
Various engineering structures, such as tunnels, viaducts, fly-overs and sunken sections, have been constructed on different clusters. After completion of the concrete work, our skilled workers installed various façade elements, railings and lintels for an attractive appearance and optimal functionality. Our professionals are still working on the finishing at the moment.
Combination Herepoort consists of: Max Bögl Nederland BV, Züblin Nederland BV, Oosterhof Holman Infra BV (Grijpskerk), Koninklijke Sjouke Dijkstra BV (leek) and Roelofs Wegenbouw BV (Den Ham).
Project status
Work in progress
Realisation
Civil concrete construction
I like working with Aelbers, because the people I ask for special work are offered. The guidance in terms of toolboxes and checking for neat work clothing is top arranged.

Adriaan Tichelaar

Construction executor Combinatie Herepoort

Ook meewerken aan dit project?

Hoe kan jij bijdragen
aan dit project

Projects we and our skilled workers are proud of

Projects we and our skilled workers are proud of

PROJECT

Rottemerentunnel (A16)

In the past few years, a lot of hard work has gone into creating an 11-kilometre stretch, setting the bar high for sustainability. To improve the quality of life and accessibility of the Rotterdam region, Rijkswaterstaat has built a new motorway along the northern parts of Rotterdam.

PROJECT

Railway station Ede-Wageningen

To serve the increasing number of passengers at the station, the municipality of Ede and NS-Stations commissioned Prorail to revamp the Ede-Wageningen section.

PROJECT

Dike reinforcement Doetinchem

Dikes are incredibly important to the Netherlands. Without them, the Netherlands would look very different. That is why it is very important to maintain these dikes.

PROJECT

Expansion A1 
Apeldoorn-Twello

Commissioned by Rijkswaterstaat, we widened the A1 together with our construction partner Heijmans. The A1 is an important economic link road in the Netherlands providing a direct connection to the European hinterland.

PROJECT

IJboulevard Amsterdam

A promenade along the IJ in Amsterdam with a hidden bicycle park under water. Together with our construction partner Van Hattum en Blankevoort, we built a bicycle park for 4,000 bikes in the heart of our capital city.

PROJECT

Construction Ring Zuid

Tackling the Ring Zuid Groningen means a large-scale conversion of the southern ring road. After seven years of work, the road was officially opened for use on 1 September 2024.

Meer weten over 

onze projecten? 

We vertellen 

graag meer!

Voornaam Achternaam

Adviseur Werving & Selectie
06 1234 5678Send a whatsapp message

Meer weten over 

onze projecten? 

We vertellen 

graag meer!

Peter

Adviseur Werving & Selectie
06 1234 5678Send a whatsapp message

Weten wanneer er een mooie
kans voor jou beschikbaar is?

Laat je gegevens achter en wij houden je automatisch op de hoogte...